Current Progress

It has been a while since I have posted, but here is what is going on currently on with my film.

I have casted two male actors (Joe Podoley and Winston McCarty) and a female actress (Jacky Gold) for the parts of Joel, David, and Sarah, respectively.

Our schedule for the remaining of the semester is as followed. We are holding a rehearsal/run-through with the cast and crew tonight between 7 and 11 pm at our location of 700 Euclid. On Friday, November 7th, we will be picking up the equipment for our film shoot. We will be using a Sony AF-100, an Open Face 650 lighting kit (hot lights), a Chimera light diffusing kit, a Glide Cam, a video tripod, shoulder mounts, flag kits, C-stands, sandbags, a Tasc Cam Recorder, HLR Cables, boom mics, boom poles, two lavalier microphones, extension cords, and surge protectors. Also on Friday, we will be using the debit card given to us to pick up the remaining props needed for this film project.

We will be shooting at 700 Euclid this Saturday and Sunday, November 8th-9th. We will also be shooting at Hendricks Chapel on Monday, November 10th, to film the ending scene of our film. Once all of these scenes are filmed, I can begin on post-production.

Production has been difficult with the recent theft of my laptop and hard drive. However, after shooting this weekend, I will have no dilemmas getting the remainder of this project completed on time.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply